As soon as we stepped in and got to know the space, it was love at first sight. We felt what was needed right at the first business meeting, listened to the wishes and goals of the owner, and realized that the apartment reconstruction project perfectly fits our business model and work execution.
Challenging, with a change in the fundamental function of the original 81m2 apartment, with a project completion deadline of 60 days, a complete reconstruction of the apartment under the "turnkey" system - just the way we love it the most. 😊
The predetermined reconstruction of the apartment on Begejska Street in Konjarnik could begin. Our main design task was to transform the original three-room apartment into a four-room apartment, create a new laundry area to relocate the boiler, and expand the living room by reducing the terrace space.
The area of the old dining room was separated by a drywall partition from the kitchen and converted into a new children's room.
In front of the bathroom, in the hallway, a laundry area was built where we relocated the boiler along with the washing machine. As a result, logically, we gained more space, which automatically allowed us to fulfill all of the client's wishes in the bathroom.
The before and after transformation of the bathroom through various phases of construction can be seen in the bathroom reconstruction video.
A complete replacement of electrical installations was carried out, as well as complete plumbing and sewage works with new installations.
The old parapet in the living room was demolished, and new, larger PVC windows were installed in its place to increase natural light and ventilation in the living room and throughout the apartment. It was also necessary to relocate the radiator in the living room to another position so it wouldn't obstruct the new window installation. Additionally, all heating system valves were replaced, and a new towel radiator was installed in the bathroom.
The floor level was adjusted in the expanded living room as part of flooring works. As in the living room, the original parapet flower boxes on the terrace were also removed.
The railing was dismantled, reworked by metalworkers, and repainted before being mounted on the newly constructed wall. Along with complete painting and finishing work, we also installed drywall ceilings on a metal framework (in certain rooms) with cascades and LED lighting concealments throughout almost the entire apartment.
The result was the possibility of installing and mounting a significantly higher amount of decorative recessed LED lighting, which enhances the ambiance and enriches the future home in the evening.
The warmth of the space was complemented by full-gloss oak parquet, laid in a triple herringbone pattern.

The before and after apartment transformation, through various renovation phases, can be seen in the apartment reconstruction video. The apartment was completed within the planned 60-day deadline and was handed over to the investors for their enjoyment with mutual satisfaction. 😊